TECHNICAL DESCRIPTION
Project: viaduct maintenance – A14 Bologna-Bari motorway, Italy.
Scaffolding: Multidirectional MULTICOM
Surface: 60,000 m2 of pillars and walkways under the bridge.
Main PON CAD module: 105 x 200 cm
Total pillars: 36
Naturally, designed with PON CAD software.